Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 26, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Wentzville, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Wentzville, MO is seeking Statements of Qualifications for Professional Design Services for Water Transmission Main Project & Distribution System Modeling. The City of Wentzville ("City") is seeking qualifications from a highly qualified consultant team to provide professional engineering services to design a Water Transmission Main & provide distribution system hydraulic modeling ("Project"). The project will primarily include analysis, design and construction of approximately 1.25 miles of dedicated water transmission main from the City's existing elevated water tank to the south side of Interstate 70 to a location identified for potential future potable water storage. The extension is planned to improve conveyance of treated water to meet increasing domestic water and fire protection demands for the growing area of the City located south of Interstate 70. In addition, the project will include updating and calibrating the City's existing distribution hydraulic model and providing a master plan report with recommendations for the City's immediate and long term potable water supply, distribution and storage needs Firms are required to complete a no-cost registration in order to view the Request for Statements of Qualifications document. Question Cutoff Date: 8/16/2023 11:00 PM (ET) Interviews (owners option) Week of September 4, 2023 Award of contract: October 11, 2023 Notice to Proceed: October 16, 2023 Preliminary Engineering/ Design Report:December 15, 2023 60% Plan Package Submittal: February 15, 2024 90% Plan Package Submittal: March 29, 2024 100% Plan Package Submittal May 3, 2024 Phase 1 Project Bid and Award: June 2024 Model and System Master Plan Completion :July 8, 2024 The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects