Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 23, 2023

April 20, 2024

S Maxwell Creek Rd

Site Work

No Information to Display

$1,300,000.00

Public - City

img_map_placeholder

S Maxwell Creek Rd, Murphy, TX

Subscribe to View Full Documents

Install approximately 4,800 LF of 8" Water Pipe by Pipe Bursting, 300 LF of 8" Water Pipe by Open Cut, 60 LF of 8" Water Pipe installed inside 15" Diameter, 3/8" thick Steel Casing by Other Than Open Cut, 18 - 1" Short Water Services, 6 - 1" Long Water Services (by Other Than Open Cut), 5- Salvage and Re-Install Fire Hydrant Assembly with Concrete Pad, 7 - New Fire Hydrant Assembly with Concrete Pad, 13 - 6" Gate Valves, 16 - 8" Gate Valves, 100 LF of 6" Fire Hydrant Lead Line installed by Open Cut, 4 - Connect to Existing 8" or 6" Water Line and 500 SY of Asphalt Pavement Repair. Estimate: 1.1 to 1.3 million dollars *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/20/2023 at 2:00 PM CT

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.