Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

September 12, 2023

1395 Pennsylvania St

Renovation

No Information to Display

$15,000.00

Public - City

img_map_placeholder

1395 Pennsylvania St, Memphis, TN

Subscribe to View Full Documents

Please provide a competitive price quote for the listed services below. Contact Senior Project Manager, Kevin Pilate at 901-544-1882 or by email: kpilate@memphisha.org. The Memphis Housing Authority is requesting a quote to camera the sanitary sewer mains running from units currently being renovated to detect any damage to existing sewer mains and cleanouts at Montgomery Plaza. The contractor is responsible for providing all equipment needed to perform said work. The contractor shall provide all camera footage via flash drive and a detailed report with recommendation for repairs of any areas of concern that may be found during the process. MHA requires, that all potential bidders visit the job site to assess the existing condition and provide a cost for a complete job. MHA reserves the right to award this project in its entirety, partially, or not at all. Wage Rates Wage rates paid to employees shall be based on and not less than the latest Non-Routine Maintenance wage rates. Insurance The Contractor shall provide and maintain adequate worker's compensation and comprehensive general liability insurance coverage for the complete period of the contract. The minimum Comprehensive General Liability coverage for this project is One Million Dollars and Zero Cents [$1,000,000.00] Allowances The bid form includes an allowance which will be used for unforeseen conditions not specified in the contract documents. Any work the contractor considers a change to the contract shall be approved by MHA prior to providing goods and services. Unused allowance remains the property of MHA and shall be deducted from the contract value via a deductive change order prior to project-close out. Payment Upon approval of work, the Contractor shall submit one payment application for this work. Question Deadline 08/03/2023 at 4:00 PM CT Any prospective bidder desiring an explanation or interpretation of the solicitation, scope of work, etc. must request it in writing to Kevin Pilate, Senior Project Manager, Capital Improvements via email to kpilate@memphisha.org LIQUIDATED DAMAGES : ($50.00) per day

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.