Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

October 30, 2023

June 1, 2024

Reiter Road

Paving, Site Work

No Information to Display

$1,621,635.00

Public - State/Provincial

img_map_placeholder

Reiter Road, Sedro Woolley, WA

Subscribe to View Full Documents

Site Directions: The project is located at the Reiter Road between Gold Bar and Index, Lat. 4750'4.86"N, Long: 121 36'12.60"W. The project consists of the phase 1 construction of parking lot/trailhead for Reiter Foothills Forest Trail System. The paved phase 1 parking lot includes 34 standard vehicle stalls, 40 truck and trailer stalls, 5 ADA stalls, 1 double vault toilet and 1 fenced storm water detention pond. The estimated cost of the project is $1,621,635, and the required substantial completion date is June 1, 2024. The project is located at the Reiter Road between Gold Bar and Index, Lat. 4750'4.86"N, Long: 121 36'12.60"W.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.