Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

November 6, 2023

November 30, 2024

141 Bassett Ln

Renovation

No Information to Display

$25,000,000.00

Public - City

img_map_placeholder

141 Bassett Ln, Barnstable, MA

Subscribe to View Full Documents

Location: Last date to submit questions: August 18, 2023 by 12:00 Noon in the procurement portal A. In general, the Contractor shall supply all material, labor, equipment, insurance, temporary protection, tools and appliances necessary for the proper completion of the work as described in the Plans and Specifications, in accordance with good construction practice, and as required by the materials manufacturers. B. Supply all shoring and protection necessary to protect the occupants, building area, building systems, and landscape areas. All means and methods are the responsibility of the contractor. The Contractor is solely responsible for safety on the job site. C. The work includes, but is not limited to: 1. General: Protect interior finishes and furnishings from the work. Repair and replace damaged materials to the satisfaction of the Owner. 2. Immediately upon signed contract, submit project schedule for review and approval. Schedule shall reflect the time required for the Contractor to procure and install the project equipment, e.g., the RTU, which are understood to havelong lead times. Work shall begin after August 31, 2023, and shall be Substantially Complete by November 30, 2024. Contractor shall phase the Work around the occupants and coordinated with the Owner. 3. If there is a conflict between or within any part of the plans and specifications, the more stringent requirement shall apply at the sole discretion of the Architect. Electrical, Plumbing, Roofing

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.