Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 15, 2023

November 15, 2023

January 8, 2025

230 W Gulf to Lake Hwy

Site Work

No Information to Display

$14,402,481.00

Public - County

img_map_placeholder

230 W Gulf to Lake Hwy, Lecanto, FL

Subscribe to View Full Documents

**As of October 28, 2023, the project has not yet been awarded. The anticipated date for award is not yet determined. Citrus County, Florida ("County") invites interested parties to submit a Bid to provide complete construction of the County's Landfill Class I Phase 4A Expansion Project that consist of approximately 19.5 acres. The Work to be done consists of the furnishing of all labor, materials, and equipment and the performance of all Work included in the Agreement. See attached Technical Specifications and Drawings for details. All work shall be performed in accordance with the construction plans, technical specifications, and contract documents. Minimum Requirements for Submitting a Bid Bidder shall meet, the following requirements in order to be determined a responsive and responsible Bidder at the time of Bid Submittal: 1. State of Florida Certified General Contractors License 2. The Bidder shall submit with the bid evidence that the Bidder, its subcontractors, and its personnel are experienced and competent to construct a Class I Landfill and related systems as described in the Technical Specifications and Drawings. 3. The Bidder shall submit at least two examples of landfill construction projects of similar design, size, scope, and complexity that have been completed by the Bidder within the last 7 years. The example projects shall demonstrate that the Bidder has direct experience performing the construction element (earthwork, liner work) or coordinating the work of subcontractor(s) performing the construction element during a project on which the Bidder was the Prime/General Contractor. For each example project, please provide: o Project name. o Project Manager's name with email and telephone number. o Project location. o Construction date. o Project write-up describing the project and its similarity to the design, size, scope, and complexity of this Project. The Bidder must have been the Prime Contractor for the project and shall identify the party/organization responsible for performing each element of the Construction element (earthwork, liner work) that was performed. This evidence shall demonstrate that the Bidder has experience to successfully complete the project in a timely manner and as required in the Bid Documents. Prebid meeting: Meeting ID: 245 924 601 505 Passcode: TsYFKh Successful Bidder shall be substantially completed within three hundred sixty (360) days after start date set forth in the Notice to proceed, and all work shall be Finally Completed within four hundred and twenty (420) days after start date set forth in the Notice to Proceed. Deadline for Questions August 18, 2023 4:00 PM

43 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.