Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 16, 2024

No Information to Display

6733 E Main St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

6733 E Main St, Mesa, AZ

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The proposed improvements are as follows: Mesa intends to purchase the hotel at 6733 E Main Street, on Main Street west of Power Road. If purchased, the facility would be used to relocate an existing, temporary housing program in Mesa referred to as "Off the Streets (OTS)." The OTS Program, launched three years ago, is currently operated about 1.5 miles west of the proposed site at the Windemere Hotel with leased rooms. This project is an important element in the City's long-term plan for the Off the Streets Program which is part of Mesa's "Housing Path to Recovery Strategic Plan." This program will use funding from the State and Local Fiscal Recovery Funds (SLFRF) program authorized by the American Rescue Plan Act (ARPA). The project includes both interior and exterior improvements to the existing site to make it ready for transition housing purposes with supportive amenities. Interior improvements will include but not be limited to updated flooring, finishes and lighting, adding fire sprinklers, conversion of a garage into livable space, creation of a computer/internet lab, security and access control updates, Tel/Data cabling, ADA and restroom updates, and miscellaneous storage enhancements. Exterior improvements include minor drainage updates, creation of a covered playground space, wall and fencing upgrades, ADA sidewalk and ramp upgrades, lighting and landscaping updates, addition of a dumpster enclosure, security and access control updates, and miscellaneous site amenities. The Design Consultants shall work directly with City staff to develop a conceptual design that must also receive approval from the City's Design Review Board prior to the preparation of a final design. The final improvement design shall include sufficient detail to receive approval from the City's Design Review Board, create construction cost estimates, prepare biddable project documents, and receive necessary building permits. The firm should have experience working with federally funded projects, and this experience should be shown on the submission. Submissions should also include a discussion of the applicant's approach to completing design in a timeframe that will allow construction funding obligation to occur before the deadlines outlined in ARPA. Provide team information and experience related to all project goals. City may include other miscellaneous improvements, as needed. Additional Pre Bid Meeting Note: At this meeting, the project team, including City staff will discuss the scope of work, general contract requirements and respond to questions from the attendees. Attendance at the Pre-Submittal Conference is not mandatory. All interested firms may submit a Statement of Qualifications whether they attend the conference or not. All interested firms are encouraged to attend the Pre-Submittal Conference since City staff will not be available for meetings or to respond to individual inquiries regarding the project outside of this Pre-Submittal conference. In addition, meeting minutes or any other information will not be posted from the Pre-Submittal Conference.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.