Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2023

January 19, 2024

September 22, 2024

Multiple Locations

Addition, Demolition, Renovation, Site Work

No Information to Display

$12,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Hampton, IA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Project #1 - Southside Elementary & Northside Elementary Miscellaneous Improvements (appx. value $1.5M-$2M) SSE: Front secure entrance renovation including moving some classroom space, office space, and entrance progressions. There is an on-going mechanical replacement project for SSE for the majority of the school, however, this entrance area was not included in that project scope due to MEP renovations required. SSE: Update MEP in the secure entrance renovated area. SSE: Enclose a vestibule ramp leading out to the playground area. SSE: Explore various water drainage issues around the perimeter and mitigate as possible. SSE: Construct a new parking lot to the west. NSE: Add a vestibule to make a secure entrance on the south side of the building. Minor renovations within the office will be included. NSE: Review for exterior maintenance items including restoration and tuckpointing. Design of this work is to be complete and issued for bidding mid-November, 2023. Construction to be completed over the summer of 2024. Location(s): SSE: 507 4th Ave SE, Hampton, IA 50441 NSE: 114 11th Place NE, Hampton, IA 50441 Project #2 – H-D High School Phase 1 Additions and Renovations (appx. value $9M-$10M) The work included in Phase 1 is included in the attached diagram. This work shall include the balance of the SAVE funding source, however, the design work for Phase 2 is also included through the Design Development stage. The exterior scope includes safety repairs to the baseball field, softball field and football field as necessary. This work could be eliminated if the bond passes as portions of Phase 2 work would replace the need for this work. Construction of a new competition gymnasium to the north side of the school, seating a minimum of 1500 spectators and shall include a lobby space and food tech classroom space. Renovation of the interior spaces including locker room spaces, restrooms throughout, science rooms, student lounge/common spaces, art room, and special education areas. Parking and infrastructure improvements including revised parking and drives, water retention, and utility work/relocation. There is an existing geothermal loop located to the NW of the HS in the practice football field area. This exact location needs to be verified. If the bond is not successful, design of this work is to be complete and issued for bidding March-April, 2024. Location(s): HDHS: 101 12th Ave NW, Hampton, IA 50441 Project #3 – H-D High School Phase 2 Additions and Renovations & Bond (scope below assumes successful bond) The work included in Phase 2 is included in the attached diagram. Construction of a new Auditorium space, Band Room and supporting spaces north of the planned Competition Gym. Construction of new Locker Room spaces to the west of the planned Competition Gym. Relocate/renovate the existing Industrial Technology classroom into the Weight Room space. Relocate/renovate the existing Weight Room space into the Industrial Technology classroom. Additional Locker Room renovations. Relocate/renovate Wrestling Room to existing Band space. Complete new field surfacing and grading on the football field. Field to be either synthetic turf or sod. Complete new field surfacing and grading at the baseball field. Field to be sod and synthetic infield turf. Update exterior facilities at the baseball and softball fields as required. Construction of additional parking to the NW of the High School. Modify existing geothermal fields and address water detention. Location(s): HDHS: 101 12th Ave NW, Hampton, IA 50441 RFQ Questions Due - August 23, 2023 RFQ Question Responses issued - August 25, 2023 - RFP Questions Due - September 13, 2023 RFP Question Responses issued - September 15, 2023 Questions and electronic submissions shall be submitted by email to the design team representative listed below. Verbal answers are not considered official - all questions submitted will be responded to and issued to all prospective firms after the questions deadline. Jesse Lizer, AIA Principal Architect- Emergent Architecture 100 E 2nd Street, Suite 204 Cedar Falls, IA 50613 319-505-0313 jesse@emergentarch.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects