Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 11, 2023

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Juneau, AK

Our team is requesting plans for this project.

Subscribe to View Full Documents

Synopsis of Proposed Contract Action JRD ERFO DAN MOLLER TRAIL BRIDGE REPLACEMENT Juneau, Alaska THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on the "Region 6 and 10 Trail Maintenance and Construction BPA" This is a competitive request for quotes under a previously issued BPA. We are NOT looking to add new contractors to the BPA at this time. -------------------------------------------------------------------------------------------------------------------- Action Code: Synopsis Date: July 28, 2023 Contracting Office Address: Procurement and Property Services, Field Procurement Operations, Northwest Procurement Zone Product or Service Code: Z2LB NAICS Code: 237310 Proposed Solicitation Number: 1240BJ23Q0041 Closing Notice Date: August 11, 2023 Contact Point or Contracting Officer: Roxanne Anderson Place of contract performance: Juneau, Alaska Description: This work is for the construction of a trail bridge on the Dan Moller Trail, as a replacement for an older bridge that washed out in a storm. Major work items include: 1. removal and relocation to storage of a temporary bridge and demolition of wood plank trail leading to the temporary or old bridge site; 2. solid rock removal to level for the bridge foundation; 3. construction of timber crib abutments; order, deliver, and install one 31' long Fiber Reinforced Polymer (FRP) trail bridge; and, 4. construction of approximately 70' total of aggregate surface approach trail to connect the existing trail to each side of the new bridge at its new location.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.