Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 30, 2023

February 27, 2024

Broken Oak Dr

Paving, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Broken Oak Dr, Wildwood, FL

Subscribe to View Full Documents

City of Wildwood will receive sealed bids for construction of Broken Oak Drive Improvements. All contractors licensed by the State of Florida are hereby invited to submit a bid on the above referenced project For more information, contact Sherri Bishop at Kimley-Horn and Associates, Inc. at (352) 438-3000. All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, and services including labor for the Work, which generally involves the following activities: Construction of approximately 2,060 LF of 6" PVC force main, approximately 710 LF of 12" PVC reclaim main, and all associated roadway rehabilitation, restoration, and tree removal along Broken Oak Drive Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 120 consecutive calendar days. A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent (5%) of Bidders maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. Copies of the Project Manual and Drawings are available for review at the City of Wildwood City Hall or the Office of the Engineer (Issuing Office). All bids shall be prepared using the Project Manual and Drawings. Addenda will be sent via e-mail to all documented plan holders up to seventy-two (72) hours before the Bid closing time. The Owner/Engineer is not responsible for delivery of addenda to prospective bidders. The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. Questions received less than seven days prior to the date for opening of Bids may not be answered

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects