Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2023

September 14, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Whistler, BC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Resort Municipality of Whistler (RMOW) Wastewater Treatment Plant is requesting a quote for the supply and delivery of the following chemicals: o60% Acetic Acid oAluminum Sulphate Question Deadline 08/08/2023 at 2:00 PM PT 1. The supply of acetic acid in 1060 kg totes. Acetic Acid deliveries will be required during the period of May through September. The daily average dosing during that time period is estimated to be 600 litres/day, with a maximum of 1000 litres/day. 2. The supply of aluminum sulphate 48% in bulk. The WWTP has two alum tanks that can hold 20,000 litres. When both tanks reach 6,000 litres, they are topped up. Aluminum sulphate is used daily at the WWTP. The daily average dosing is 275 litres/day with a maximum of 600/650 litres/day. 3. The price for the chemicals shall include all transportation and freight costs to the point of delivery. Deliveries can be made seven days a week from 7:15 am - 4:00 pm. 4. The price shall include all related and incidental costs associated with the acetic acid, including costs related to the pickup, return, cleaning, and/or proper disposal of chemical containers. 5. The RMOW will enter a one-year contract with the supplier with the option to extend the contract for another year. 6. The chemical usage quantities provided in the RFQ are estimated. The quantities may go up or down depending on how the treatment plant process is working.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.