Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 23, 2023

March 31, 2024

Multiple Locations

Site Work

No Information to Display

$3,700,000.00

Public - City

img_map_placeholder

Multiple Locations, Oregon City, OR

Subscribe to View Full Documents

ENGINEER'S ESTIMATE: $3.7M The project includes: o 10,000 LF of 8-Inch to 18-Inch Mainline Cured-in-Place Pipe (CIPP) o 10,000 LF of Lateral Rehabilitation o 5 Open-Cut Spot Repairs o 3 New 48" Manholes o Grind and Inlay o Perform additional and incidental Work as called for by the Specifications and Plans. Addenda, clarifications, and notices will be distributed through the City's online plan holder system. Potential bidders are responsible for ensuring that contact information is registered correctly and that email updates are being received and not being sent to spam folders. It is in the best interest of potential bidders to check the website periodically to ensure all updates are received. The City is not responsible for failure of bidders to receive notifications of changes or corrections made by the City and posted as stated above. No bid will be received or considered unless the bid contains a statement by the bidder, as part of their bid, that the provisions of ORS 279C.840 or 40 U.S.C. 276a shall be complied with, a statement as to resident bidder status, and whether the bidder is licensed under ORS 468A.720 (no asbestos removal is contemplated for this project). Prior to submission of its bid, the bidder shall be registered with the Oregon Construction Contractor's Board, and thereafter comply with the requirements of ORS 701.005 to 701.137. Each proposal must be submitted on forms prescribed by the City and accompanied by a certified check, cashier's check, or bid bond in an amount equal to 10 percent (10%) of the total amount bid. The successful bidder will be required to furnish a faithful performance bond and a labor and material payment bond each in the amount of one hundred percent (100%) of the amount of contract. The successful bidder will also be required to furnish a statutory public works bond in the amount of thirty thousand dollars ($30,000.00). Evidence of workers' compensation insurance will be required before the work shall commence. The City will investigate and determine the qualifications of the apparent low bidder prior to awarding the contract. The City reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject all bids if it is in the public interest to do so. Question Deadline 08/21/2023 at 12:00 PM PT For more information regarding this project, please submit questions through the online

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.