Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 11, 2023

September 18, 2023

October 31, 2023

Multiple Locations

Site Work

No Information to Display

$297,850.00

Public - County

img_map_placeholder

Multiple Locations, Falher, AB

Subscribe to View Full Documents

The Smoky River Regional Water Management Commission (SRRWMC) would like to upgrade the water treatment plant in the Town of Fahler to address immediate repairs required. The SRRWMC Clarifier Internals Repair Project includes the supply of newly manufactured clarifier internals equipment, the implementation of a temporary clarifier to maintain functionality of the water plant during the installation period and the selection of a mechanical contractor to complete the installation work. The intent of the RFP is to obtain offers for supply, design, fabrication, shipment, onsite integration, and commissioning of packaged clarifier internal components, including pre-fabricated equipment or integration of existing equipment, instrumentation, programmable logic control, programming, wiring, electrical panels and junction boxes, starters, VFDs, and all other ancillary support systems for standalone functionality of the equipment. The Owner intends to enter into an Equipment Supply Contract Agreement with the successful Proponent. The Owner also intends to Novate the Equipment Supply Contract (Contract 1) to a General Construction Contractor (Contract 2) through a Novation Agreement. The Equipment Supply Contract includes provisions for the Owner to cancel the equipment supply contract in the event sufficient funding for the project is not approved. The Proponent's submitted proposal will form part of the agreement. The Hamlet of Ridgevalley sanitary sewer system consists of a combination of sanitary sewer forcemain and gravity sewer mains connected via sanitary sewer manholes. The intent of the RFQ is to obtain quotations for: Relining the existing sanitary sewer lift station wet well Relining 20 existing sanitary sewer manholes. Documents can be obtained from https://m2eng.bidsandtenders.ca/

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.