Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

April 22, 2024

No Information to Display

2832 Parkhaven Dr

Demolition, New Construction, Renovation, Site Work

No Information to Display

$84,615,000.00

Public - City

img_map_placeholder

2832 Parkhaven Dr, Plano, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Construction of a new Middle School (Grades 6-8) approximately 152,000 SF. Site conditions such as circulation, fire lanes, parking, and landscape/irrigation should also be examined and included in the work and overall plan. The new middle school will be built on the existing Haggard MS site to replace the current campus. The existing building will remain in use during the construction of this project. Great care will be given to protect and maintain the present site, building, services, infrastructure, security and access. Multiple construction phases may be considered to accomplish the work of this project. Once the new building is complete then the existing can be demolished. NOTE: We anticipate that code will require a storm shelter. The existing track will be removed to make room for the new building, and when relocating the new track it will need to be a 4-lane synthetic track. The existing softball field on the adjacent Plano Senior High campus in our initial mapping may also be in the way of the new building in which case it will need to be demo'd and relocated as well. ESTIMATED BUDGET AND LOCATION Estimated Construction Budget - $84,615,000 Date for Construction Agreement: Presented to the Board on or about October 3, 2023. Owner reserves the right to reject any or all bids and to waive irregularities or informalities as may be deemed in Owner's interest. For additional information, see the Instructions to Proposers in the Proposal documents for each project or call the PISD Purchasing Department 469-752-0291. The Board of Trustees, for the purpose of complying with Section 2258, Subchapter B of the Texas Government Code for all public contracts, has adopted the prevailing wage rates as determined by the United States Department of Labor in accordance with the Davis-Bacon Act as the published rates for the District. Question Cuttoff Date & Time 8/15/2023 04:00:00 PM (CT)

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.