Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

December 16, 2023

3227 AR-42

Outdoor Lighting, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

3227 AR-42, Cherry Valley, AR

Subscribe to View Full Documents

A general description of the Work to be done is contained in the ADVERTISEMENT FOR BIDS. The scope is indicated on the accompanying Drawings and specified in applicable parts of these Contract Documents The Contract Documents governing the Work proposed herein consist of the Drawings and all material bound herewith. These Contract Documents are intended to be mutually cooperative and to provide all details reasonably required for the execution of the proposed Work. Any person contemplating the submission of a Bid shall have thoroughly examined all of the various parts of these Documents, and should there be any doubt as to the meaning or intent of said Contract Documents, the Bidder should request of the Engineer, in writing (received by the Engineer at least 5 working days prior to bid opening) and interpretation thereof. The work to be performed consist of installing poles and lighting system for a proposed softball and baseball field located at the City Park. The City will have a separate contractor on site to install all conduit, wire, handboxes, and related items to provide the power for the lighting system. This contractor will be responsible for setting of the panels and contacts from the manufacturer. The contractor will confirm all work meets the manufacturer's scope for their equipment and confirm that all lights will meet the requirements as shown in the specifications.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.