Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 25, 2023

February 22, 2024

Multiple Locations

Renovation

No Information to Display

$290,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Nashville, TN

Subscribe to View Full Documents

Project is to renovate first floor of Building 100; renovation to include, but not limited to, new HVAC, lights, and ceiling. Bidders submitting bids equal to or greater than $25,000 in value are required to be licensed in accordance with state law. A statement of public contract crime status and minority business status is required on the Bid Form. Additionally, the Drug Free Workplace Affidavit and a five percent (5%) bid security is required. Non-discrimination policy applies to this project. The Owner reserves the right to waive informalities and to reject bids A. Demolish first floor HVAC and lights for building 100. B. Contractor to protect existing utilities including IT conduit and wiring as part of work. C. Contractor to protect existing wall and floor finishes as part of work D. Replace 1st floor HVAC system with new VRF system. E. Replace 1st floor lighting in areas of work. F. Replace 1st floor ceiling and grid in areas of work G. Work will require new roof mounted equipment and work on 2nd floor to carry roof mounted utilities to the first floor. H. Prior to beginning work, contractor shall create a detailed CPM type schedule for owner and designer review. Schedule shall: 1. Identify all major activities including Test and Balance and Commissioning. 2. Provide a sequence for all activities. 3. Completion time for each activity. 4. Identify the critical path or the longest path to complete all activities. I. Project Substantial Completion shall include Test and Balance and HVAC Controls. Project will not be considered substantially complete if these items are not complete.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.