Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

December 25, 2023

April 9, 2025

Multiple Locations

Site Work

No Information to Display

$32,866,904.00

Public - County

img_map_placeholder

Multiple Locations, Palm Desert, CA

Subscribe to View Full Documents

1. The project consists of installing approximately 21,454, linear feet of 30-inch and 4,429 linear feet of 12-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, imported sand, testing, disinfection, clearing and grubbing, excavation, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, and all related backfill and compaction. Portions of the pipeline will cross above ground the Coachella Valley Stormwater Channel, Buchanan Street Channel and Lincoln Street Channel within a steel casing with pipe bridge supports, rip rap removal and replacement, and concrete slope protection as indicated in the Contract Documents. 2. Existing CVWD Irrigation Lateral Nos. 97.1-4.3 and 98.0 shall be replaced as indicated in the Contract Documents. 3. Installation of the Pressure Reducing Station includes, but is not limited to, clearing and grubbing, grading, excavation, compaction, installation of concrete pad, security fence, new electrical service, all piping, 12-inch diameter zinc-coated restrained joints and V-Bio Polyethylene encased ductile iron pipe, connections, pipe supports, and all mechanical components as indicated in the Contract Documents. 4. Destruction of Manuela Garcia Mobile Home Park well, removing and disposing of all well appurtenances, remove connection to existing potable water system, connection to the public water system and associated onsite work as indicated in the Contract Documents. 5. Saint Anthony Mobile Home Park and Seferino Huerta Mobile Home Park remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 6. Work shall also include protecting in place or removing and replacing all existing utilities and private and public improvements, including, but not limited to, curbs, gutters, concrete pavement, asphalt concrete pavement, landscaping, landscaping irrigation facilities, traffic striping, power poles, guy wires, street lights, signs, fences, and walls. License Requirements Class A License Liquidated Damages Reverse Liquidated Damages: $2,500/Day and Liquidated Damages: $3,000/Day Question Deadline 09/27/2023 at 5:00 PM PT Online Q&A Yes Arrangements may be made for visiting the Site by contacting CVWD's Representative.

141 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.