Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 24, 2023
December 25, 2023
April 9, 2025
Multiple Locations
Site Work
No Information to Display
$32,866,904.00
Public - County
Multiple Locations, Palm Desert, CA
1. The project consists of installing approximately 21,454, linear feet of 30-inch and 4,429 linear feet of 12-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, imported sand, testing, disinfection, clearing and grubbing, excavation, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, and all related backfill and compaction. Portions of the pipeline will cross above ground the Coachella Valley Stormwater Channel, Buchanan Street Channel and Lincoln Street Channel within a steel casing with pipe bridge supports, rip rap removal and replacement, and concrete slope protection as indicated in the Contract Documents. 2. Existing CVWD Irrigation Lateral Nos. 97.1-4.3 and 98.0 shall be replaced as indicated in the Contract Documents. 3. Installation of the Pressure Reducing Station includes, but is not limited to, clearing and grubbing, grading, excavation, compaction, installation of concrete pad, security fence, new electrical service, all piping, 12-inch diameter zinc-coated restrained joints and V-Bio Polyethylene encased ductile iron pipe, connections, pipe supports, and all mechanical components as indicated in the Contract Documents. 4. Destruction of Manuela Garcia Mobile Home Park well, removing and disposing of all well appurtenances, remove connection to existing potable water system, connection to the public water system and associated onsite work as indicated in the Contract Documents. 5. Saint Anthony Mobile Home Park and Seferino Huerta Mobile Home Park remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 6. Work shall also include protecting in place or removing and replacing all existing utilities and private and public improvements, including, but not limited to, curbs, gutters, concrete pavement, asphalt concrete pavement, landscaping, landscaping irrigation facilities, traffic striping, power poles, guy wires, street lights, signs, fences, and walls. License Requirements Class A License Liquidated Damages Reverse Liquidated Damages: $2,500/Day and Liquidated Damages: $3,000/Day Question Deadline 09/27/2023 at 5:00 PM PT Online Q&A Yes Arrangements may be made for visiting the Site by contacting CVWD's Representative.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Palm Desert, CA
Bid Date: Jun 14 2023
Palm Desert, CA
--
RFP Contractor - Greens/Tee Box Renovation and Turf Reduction at Desert Willow Golf Resort - 4779709
Palm Desert, CA
Bid Date: Aug 10 2023
Palm Desert, CA
Bid Date: Aug 22 2023
Palm Desert, CA
--
Palm Desert, CA
Bid Date: Aug 30 2023
Palm Desert, CA
Bid Date: Nov 01 2023
Palm Desert, CA
Bid Date: Jul 21 2023
San Pablo, CA
Bid Date: Aug 15 2023
Glendale, CA
Bid Date: Aug 16 2023
Placerville, CA
Bid Date: Jul 20 2023
Fontana, CA
Bid Date: Aug 08 2023
Clearlake Oaks, CA
Bid Date: Aug 10 2023
Sacramento, CA
Bid Date: Jul 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
