Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

November 1, 2023

May 12, 2024

7125 Monarch Blvd

Renovation, Site Work

No Information to Display

$893,100.00

Public - City

img_map_placeholder

7125 Monarch Blvd, Castle Pines, CO

Subscribe to View Full Documents

Rehabilitation of the coating systems inside two (2) below grade concrete tanks and one (1) above grade steel storage tank. Scope also includes the replacement of tank inlet piping, installation of coating systems in chemical containment areas, the replacement of two hatches, and the installation of new access ladders and fall arrest systems for the two (2) below grade concrete tanks. The Bidder to whom a contract is awarded will be required to furnish a "Performance and Payment" bond to the District. The "Performance and Payment" bond shall be furnished in conformity with the requirements of the Contract Documents. The District reserves the right to reject any and all proposals, or to accept that proposal or combination of proposals, if any, which in its sole and absolute judgment, will under all circumstances best serve the District's interest. No proposal will be accepted from any firm, person, or corporation, who is a defaulter as to surety or otherwise, or is deemed incompetent, irresponsible, or unreliable by the District Board of Directors. No bids will be considered which are received after the time indicated above, and any bids so received after the scheduled closing time shall be returned to the bidder unopened. The plant is scheduled to be offline during construction. Construction is expected to start November 1, 2023, completion five months later, at the end of March 2024. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects