Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 18, 2023

May 15, 2024

Memorial Dr & State Rd 1208

Paving, Site Work

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

Memorial Dr & State Rd 1208, Pinehurst, NC

Subscribe to View Full Documents

Contract No.: DH00528 WBS: 48720.3.1, 48719.3.1, 2023CPT.08.18.10631, and 2023CPT.08.18.20631 TIP Number: SM-5708C & SM-5708D County Moore Description: Grading, paving, drainage, signals, and pavement markings at the intersection of US 15-501, SR 1208 (Page Road), and Memorial Drive. Resurfacing on US 15-501 and SR 1208 (Page Road The North Carolina Department of Transportation is requesting bids for the above-mentioned project located in Division 8. The date of availability for this contract is September 18, 2023. The completion date for this contract is one hundred eighty (180) days after completing Intermediate Contract Time Number 1 for Map 1 and Map 2. For questions, please contact me at (910) 773-8034 or cgbrown1@ncdot.gov. NC DOT - Grading, Paving, Drainage, Signals and Pavement Markings

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.