Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 6, 2023

No Information to Display

Freedonia Rd & Middlebrook Pond Rd

New Construction, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Freedonia Rd & Middlebrook Pond Rd, Monticello, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Per Bill Nash please contact him directly for documents. Will only send to contractors. For construction of the Jasper County Community Food Bank located at Freedonia and Middlebrook Pond Roads, Monticello, GA 31064.The funding is provided, in part, by a Community Development Block Grant, and applicable portions of the work must conform to Davis Bacon Wage Rates. Bidders must provide E-verify and Section 3 compliance information as well. A. All contracts are subject to Federal and State contract provisions by the Georgia Department of Community Affairs (DCA) and the U.S. Department of Housing and Urban Development (HUD). B. This project is covered under the requirements of Section 3 of the HUD Act of 1968, as amended and Section 3 Business Concerns are encouraged to apply. C. This project also abides by the following laws as they pertain to HUD Assisted Projects: Title VI of the Civil Rights Act of 1964; Section 109 of the Housing and Community Development Act of 1974, Title 1; Title VII of the Civil Rights Act of 1968 (Fair Housing Act); Section 104(b)(2) of the Housing Community Development Act of 1974; Section 504 of the Rehabilitation Action of 1973 as amended; Title II of the Americans with Disabilities Act of 1990 (ADA); and the Architectural Barriers Act of 1968. D. Contracts for this project must include but are not limited to provisions covering: Equal Employment Opportunity (E.O. 11246) as supplemented by (41 CFR, Part 60); Copeland "Anti-Kickback" Act (18 U.S.C. 874) as supplemented by (23 CFR, Part 3); Davis-Bacon Act (40 U.S.C. 27ato a-7) as supplemented by (29 CFR, Part 5); Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by (29 CFR, Part 5); Section 306 of the Clean Air Act (42 U.S.C. 1857(h)) or Section 508 (33 U.S.C. 1368); Debarment and Suspension (Executive Orders 12549 and 12689); Byrd AntiLobbying Amendment (31 U.S.C. 1352); Drug-Free Workplace requirements; Section 6002 of the Solid Waste Disposal Act, as amended. All Bidders must submit E-verify Affidavits with Bids. Bids will be received for Single Prime. All proposals shall be lump sum. Construction of a new Jasper County Community Food Bank to be located at the Northeast corner of Freedonia at Middlebrook Pond Roads. This project is a 4,165 gsf pre-engineered enclosed metal building plus a 1,451 gsf covered drive-through. The building will include woodframed office partitions, 2 overhead doors, 4 hollow metal personnel doors, one truck dock, and will be fully air conditioned. Constructionin this contract is limited to the building, earthwork extending ten feet from the building, and minor concrete slabs on the site. The balance of site work, septic system, and water well will be accomplished under a separate contract(s). Payment of the contract amount will be made on a periodic basis on applications for payment from the Contractor and approved by the Architect based on work accomplished. Further details regarding payment provisions of the Contract are contained in following sections of Project Manual. All bids must be accompanied by a Bid Bond in an amount not less than 5% of the amount bid. The Successful Bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of 100% of the Contract Amount. The surety company on the contract Performance Bond shall be a surety company authorized to do business in the State of Georgia. Said bond and surety shall be subject to approval by the attorney for the Owner. Proof of General Liability Insurance and Workman's Compensation Insurance will be required with the Jasper County Board of Commissioners listed as an additional insured. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. Attorneys-in-fact who sign Bid Bonds must file with the bond a certified and effectively dated copy of their Power of Attorney. This shall be attached to the Bid Bond. The Owner reserves the right to reject any and all bids, to waive informalities, to waive minor irregularities, and to accept the lowest or best bid. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 45 days

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects