Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

September 1, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Americus, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Epoxy Flooring City of Americus Fire Department Station 2 Crawford Street Fire Station. Notice is hereby given that the City of Americus, Georgia will receive bids at the City Clerks office, 101 W. Lamar Street Americus, Georgia for the following: Epoxy Flooring for Area (1) 3,094 sq. ft. (Engine Bay and Mechanical Room) & Area (2) 4,906 sq. ft. (Office, Living Area, Classroom) for the City of Americus Fire Department Station 2 Crawford Street Fire Station. GENERAL SPECIFICATIONS: 1. Remove the existing floor finish. (Tile, Carpet, Glue, Old Coating). 2. Machine grinds the entire area to establish a proper bond profile. 3. Patch spalled areas using 100% solids Epoxy Patch materials. 4. Allow the patched areas to cure and re-grind those areas. 5. Vacuum the entire area. 6. Apply one coat of Epoxy at 250 sq. ft. per gallon. 7. Apply a second coat of Epoxy at 150 sq. ft. per gallon. 8. Allow the surface to cure for 8 hours. 9. Apply one coat of high traffic, HTS, Topcoat at 500 sq. ft. per gallon. 10. Allow the surface to cure for 12 hours. 11. Apply lines and markings for bay area. 12. Broadcast chosen flake media into the wet surface until rejection. 13. Apply one coat of UV Resistant Epoxy at 100 sq. ft. per gallon. 14. Allow surface to cure for 24 hours minimum before opening to traffic. PLACE OF RENOVATIONS The successful bidder shall EXCEPTIONS TO SPECIFICATIONS: Exceptions shall be allowed if they are equal to or superior to the intent of the specification as written and provided, they are listed and entirely explained on a separate page entitled Exceptions to Specifications. If the bidder takes an exception, on the exception page, the bidder must state an option price to bring their specifications into full compliance with the department specifications. Failure to provide the information shall cause us to reject the proposal as being non-responsive.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.