Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

April 29, 2024

June 3, 2024

Multiple Locations

Site Work

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Lexington, NC

Subscribe to View Full Documents

Contract No.: DI00322 WBS: 49321.3.7 County Davidson and Forsyth Federal Aid No: 0109024 TIP no : HS-2009F Route: NC 109 in Davidson County from MP 32.38 (North of SR 1756/SR1798 (Old Greensboro Road/W. Lexington Avenue Ext.) to MP 38.37 (South of SR 1711 (Gumtree Road) and NC 109 in Forsyth County from MP 0.26 (South of SR 2701 (Devoe Road) to MP 3.30 (South of I-40) Type of Work: Pavement Markings and Sinusoidal Rumble Strips The North Carolina Department of Transportation is requesting bids for the above subject Contract Proposal. The Contractor is to furnish labor, material, and equipment. Contractors must be pre-qualified by NCDOT prior to bidding on this project. If you have questions about the proposal, or need additional information concerning this project, contact Jeff Turner at (336) 747-7800. The date of availability for this contract is the date the Contractor begins work, but not before September 25, 2023 or later than April 29, 2024. The completion date for this contract is May 3, 2024. The liquidated damages for this contract are Six Hundred Dollars ($600.00) per calendar day NC DOT - Pavement Markings and Sinusoidal Rumble Strips Disadvantaged Business Enterprises 0.0 %. The completion date for this contract is the date that is Sixty (60) consecutive calendar days after and including the date of availability. PROJ. NO 0109024 49321.1.7 49321.3.7

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.