Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

November 27, 2023

No Information to Display

100 College Dr

Addition, Demolition, Remodeling, Renovation, Site Work

No Information to Display

$14,350.00

Public - City

img_map_placeholder

100 College Dr, Sterling, CO

Subscribe to View Full Documents

4. A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive. 5.TAXES: The bidder's attention is called to the fact that the Bid submitted shall exclude all applicable federal excise or manufacturers' taxes and all state sales and use taxes as hereinafter set forth in Article 9C of the GENERAL CONDITIONS. The Applied Technology Campus Expansion and Remodel project consists of building an approximately 30,000 ft2 pre-engineered metal building that will attach to the existing Lebsack Schmidt Hall. Scope of Work includes Installation of a new pre-engineered metal building that attaches to the existing Lebsack-Schmidt Building. Scope includes all foundation work, electrical, mechanical, plumbing and site work as described in construction drawings, and project manuals. Date Email Questions Due Wed., August 23, 2023, 4 p.m. MD/ST Late sealed bids will be rejected without consideration. The CDHE/Northeastern Junior College and the State of Colorado assume no responsibility for costs related to the preparation of submittals.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.