Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 14, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Spirit Lake, ID

Our team is requesting plans for this project.

Subscribe to View Full Documents

The new Well #6 construction project will include drilling an additional 16- to 18-inch well to a depth of approximately 600 feet on an existing City-owned utility lot in the northeasterly portion of town, purchase and installation of a well pump with associated piping and electric, and connection to the existing infrastructure at the site (well #5 and reservoir #3). The Well #6 project will address existing capacity issues and reduce the risk of depressurization and overall system contamination by providing improved redundancy, fire flow capacity, and reliability for the system users in the area.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.