Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 26, 2023

September 6, 2023

October 6, 2023

7210 NE 2nd Ave

Paving, Renovation, Site Work

No Information to Display

$50,000.00

Public - County

img_map_placeholder

7210 NE 2nd Ave, Miami, FL

Subscribe to View Full Documents

This project is for general building repairs to units located within Gwen Cherry 5/New Haven Gardens development and consists of fence repairs, erosion control, repair/paint flashing around roof, installation of rain gutter, repair to staircase door and sidewalk repair. For Section 3 Related Questions please contact the Section 3 Coordinator Phone: 786-469-4227 E-mail: Section3@miamidade.gov For Procurement Related Questions PHCD Procurement Contact: Colleen Johnson Phone: 786-469-4166 The scope of work below includes tasks that should be perform by the contractor at a minimum. Tasks, clean-up, and removal of all items not specifically mentioned in the scope, but which are obviously required for an operable/functional system shall be included without additional cost to PHCD. The Contractor shall be responsible for all job tasks associated with the successful repair of the stated scope of work, as required and approved by an authorized PHCD representative. Tasks, clean-up, and removal of all items not specifically mentioned in the scope, but which are obviously required for an operable/functional system shall be included without additional cost to PHCD. The Contractor shall arrange for his/her own storage facility (if needed). The Contractor shall leave the site free and clear of all debris. The Contractor is responsible for providing all materials, labor, equipment, and permits/inspection fees (when necessary) for the total completion of this work. All work shall be performed in the best standards of workmanship and shall be in accordance with Florida Building Code, all national, state, county, and municipal codes, rules, guidelines, regulations, and departments having jurisdiction. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.