Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

September 25, 2023

November 6, 2023

Sunridge Dr

Paving, Site Work

No Information to Display

$350,000.00

Public - City

img_map_placeholder

Sunridge Dr, Scotts Valley, CA

Subscribe to View Full Documents

The scope of work to be performed under this contract consists of the removal and replacement of the existing culvert; rebuilding the headwall; and rehabilitation of the road above. Work associated with this project also includes: Maintaining through traffic Maintaining downstream flows during construction Maintaining appropriate erosion control Other items or details not mentioned above that are required by any provisions herein shall be performed, constructed or installed. Bids are required for the entire Work described herein. Time is of the essence for completing required work. The time limit for the completion of all work shall be 30 working days after issuance of notification to proceed by Public Works Director or prior to the start of the rainy season on October 15th, whichever comes first. Contractor shall commence work within ten (10) days after issuance of notification to proceed by Public Works Director, as set forth in General Conditions, Legal Relations and Responsibilities Liquidated damages shall be assessed in the amount of one thousand five hundred dollars ($1,500.00) for each calendar day the work remains incomplete beyond the time fixed above for completion.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.