Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

October 12, 2023

July 8, 2024

To Be Determined

Renovation

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Camp Lejeune, NC

Subscribe to View Full Documents

Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. Contract Completion Date: 270 days after award Requests for Information (RFIs): RFIs must be submitted to tony.d.benson.civ@us.navy.mil. The cut off for RFIs is September 01, 2023 by 2:00 PM EST in order to process all inquiries by the proposal due date. Wage Determination: General Decision Number: NC20230038 04/21/2023 Liquidated Damages: $880 per Calendar Day Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification. Special Scheduling: Yes, the facility/activity will remain in operation during the entire construction period. Project will be phased, see sheet A102. Site Visit: A site visit will not be scheduled. Contractors may visit the site(s) on their own. Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Estimated Cost Range: Between $500,000 and $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects