Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

June 3, 2024

August 30, 2024

I-94

Paving, Site Work

No Information to Display

$4,258,000.00

Public - State/Provincial

img_map_placeholder

I-94, Albion, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

9.08 mi of hot mix asphalt cold milling and resurfacing and pavement markings on I-94 westbound between 21 1/2 Mile Road and 29 Mile Road, including the eastbound and westbound ramps and I-94BL (C Drive North) from the ramps to I-94 business route (28 Mile Road) in the city of Albion, Calhoun County. This project includes a 3 year materials and workmanship pavement warranty. Net classification required for this project is 4258 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3A. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No IM 13083 213293A 23A0739 MI DOT - 2309 007 - Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on I-94 All contract work, except for second application of pavement marking must be complete by the interim completion date of August 2, 2024. The entire project must be completed by the final completion date of August 30, 2024. start work on the date approved by the Engineer, which must be no earlier than June 3, 2024.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects