Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

October 20, 2023

September 6, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$5,079,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Ann Arbor, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bridge rehabilitation including epoxy overlay, concrete deck patching, barrier and substructure repair, replacement of expansion joints, beam painting, beam repairs, silane treatment, concrete surface coating, metal mesh panel installation, slope paving repairs and approach work on 4 structures on US-23/M-14 and Great Lakes Central Railroad and Pontiac Trail in the city of Ann Arbor, Washtenaw County. This project includes a 2 year concrete surface coating warranty, 2 year beam coating warranty and 5 year epoxy overlay warranty. Net classification required for this project is 5079 N4 In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No BFP 81103 204943A 23A0735 MI DOT - 2309 006 - Bridge Rehabilitation Including Epoxy Overlay, Concrete Surface Coating, Metal Mesh Panel Installation, Slope Paving Repairs and Approach Work on 4 Structures The construction goal for women in any Michigan county is 6.9% All remaining work must be completed by the final completion date of September 6, 2024. After award, start work on the date approved by the Engineer, which must be no earlier than October 20, 2023. In no case may any work be commenced prior to award by the Department.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.