Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

April 1, 2024

June 14, 2024

Pipestone St

Paving, Site Work

No Information to Display

$284,000.00

Public - State/Provincial

img_map_placeholder

Pipestone St, Benton Harbor, MI

Subscribe to View Full Documents

0.29 mi of hot mix asphalt cold milling and resurfacing, concrete sidewalks and ramps and pavement markings on Pipestone Street from Wall Street to Empire Avenue in the city of Benton Harbor, Berrien County. This is a Local Agency project. Net classification required for this project is 284 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STUL 11000 215935A 23A0684 MI DOT - 2309 004 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Sidewalks and Ramps and Pavement Markings on Pipestone Street

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.