Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 22, 2023

December 21, 2023

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

Multiple Locations, Excelsior, MN

Subscribe to View Full Documents

This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, Temporary Suspensions. During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the Contractor the value of the device as determined by the Engineer. The major items of work are approximately: 1 each grubbing; 16 lin ft remove concrete culvert; 12 cu yd common embankment (cv); 378 lin ft lining culvert pipe (36") special; 28 sq yd geotextile filter type 4; 18 cu yd random riprap class iii; 5 each traffic control (special); 120 lin ft sediment control log type compost; 3 m gallon rapid stabilization method 3; 5 each site restoration Question Deadline 08/15/2023 at 2:00 PM

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.