Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 11, 2023

September 5, 2023

November 4, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Littleton, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000326354 The work will include storm sewer improvements, regrading/earthwork, curb & gutter, sidewalk, landscape restoration, and asphalt paving at four intersections within the Aberdeen Village neighborhood and Ketring Park in Littleton, CO. All work will take place along residential streets. Approximate quantities include 230 LF of RCP storm drain, 8 inlets, 2 manholes, 670 LF of gutter, 125 LF of crosspan, 500 LF of perforated underdrain, and 390 Tons of asphalt paving. This project will require coordination with City Mill & Overlay Project 23-04, which will provide the final 2" top lift of asphalt paving. Job Location Aberdeen Village - Any questions concerning the bid documents or Plans must be submitted to the Project Manager, Kyle Morris, kmorris@littletongov.org, at the City of Littleton, by Tuesday, August 8th , 2023 at 11:00 AM. General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - FOB Pre-Paid - Installation Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Each Proposal must be accompanied by a bid bond or a certified check payable to the City of Littleton in the amount of not less than five percent (5%) of the total amount bid. The successful Bidder will be required to furnish the city a Performance, Labor and Material Payment Bond for 100% of the Contract amount. The Contractor shall complete the Contract in no later than 60 calendar days, after the date specified start date of September 5th, 2023. RIGHT TO ACCEPT AND REJECT BIDS: The Owner reserves the unqualified right, in its sole and absolute discretion, to reject all bids and to cancel the project. Further, the Owner reserves the unqualified right, it its sole

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.