Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 9, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Juneau, AK

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Consultant shall provide all necessary professional services, including, but not limited to, research, engineering, surveying, and design services to prepare complete, bid-ready construction drawings, specifications, bid schedule, engineer's estimate for construction, neighborhood outreach, and coordination assistance for the removal and replacement of the staircases. The scope of construction work includes coordination with AELP, CBJ Street Division, CBJ Wastewater Division, and CBJ Water Division regarding any utilities that may exist and that need replacement. Other elements of this work may include miscellaneous other improvements necessary for a complete project. The stairways in need of significant attention include, but are not limited to: o Boroff Way o Decker Way o Upper section of Rawn Way and connected boardwalk on Gastineau Ave o 2nd St stairs to Apartment Building o 3rd St/Harris St to top of Stairs and connected boardwalk. o 5th St-Kennedy St to Park St o End of East St to 4th St- Stairs on East St to recently replaced boardwalk portion. o Pine St to Hermit St o Upper 1/3 section of Cope Park Stairs-Wooden retaining wall to 7th St Given the extreme volatility in the construction materials and labor markets, the consultant shall provide documented correspondence from long lead time and/or specialty items that could impact schedule and cost. This information shall be presented with the project estimates, expected at 65%, 95% and final, bid ready documents. QUESTIONS REGARDING THIS RFP: Greg Smith, Contract Administrator, phone 907-586- 0800 ext. 4196, fax 907-586-4530, greg.smith@juneau.gov is the sole point of contact for all issues pertaining to this procurement. Question Deadline 08/09/2023 at 2:00 PM AKT

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.