Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

No Information to Display

Lake Michigan Rd

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Lake Michigan Rd, Lake Township, MI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email Subject must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. Please do not submit Electronic questions via Electronically. ALL questions should be emailed to Shane Brennan at shane.brennan@spicergroup.com no later than 4:00 p.m., Eastern on August 24, 2023. Construct a sheet pile retaining wall along the north face of the existing Platte River Lower Weir to prevent further undermining. Fill annular space between the sheet piling and weir concrete pile cap with peastone. Install riprap along the south face of the weir to fill undermined areas and protect from further erosion. Restore areas disturbed during construction. Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability) Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response. You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible. Bid Responses should not be emailed to the Project Director.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.