Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 5, 2023

March 3, 2024

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Powellton, WV

Our team is requesting plans for this project.

Subscribe to View Full Documents

Furnishing all materials, labor, and necessary items for the construction and installation of the 137,000-gallon water storage tank, valve vault, telemetry, pile and lagging retaining walls, fencing, site access road, decommissioning the existing tank, connection to the existing system, and all the related appurtenances All bid must be accompanied by a Bid Guarantee Bond payable to the Owner for five percent (5%) of the total amount of the Bid or a Certified Check, Cashier's Check, or Letter of Credit in the amount of not less than five percent (5%) of the Bid. Contractors are required to comply with all laws pertaining to the federal wage rates issued in accordance with the Davis Bacon Act. Each Bidder must fully Comply with the Disadvantaged Business Enterprises, and Affirmative Action Requirements, as identified in the contract documents. The Bidder agrees to make "positive efforts" to subcontract a portion of the total value of the contract to Disadvantaged Business Enterprises. This shall be done in compliance with the six (6) affirmative steps as outlined in 40 CFR 33.240. Failure to demonstrate positive efforts to do so may lead to rejection of bids. For this program, the term "subcontract" includes all construction, modification, and service work contracted for by the bidder in the execution of the work under this contract. Pursuant to West Virginia Code 5-22-2, requirements stated in the advertisement for bids and the bid form may not be waived by any public entity. All bidders are required to have a West Virginia contractor's license per Section 21-11-11 of the West Virginia Code. A Contractor's License Number is to be included on the bid submission. Contract Times for Contract: 120 calendar days to substantial completion and 150 calendar days to complete work ready for final payment. Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) for Substantial Completion until the Work is substantially complete. The Owner reserves the right to reject any and all bids.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects