Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 30, 2024

August 31, 2026

Hunt Ave

Outdoor Lighting, Paving, Site Work

No Information to Display

$900,000.00

Public - City

img_map_placeholder

Hunt Ave, Alamosa, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of October 16, 2023, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2024. *The closed solicitation has been included below for reference: The City of Alamosa, Colorado, hereinafter referred to as the City of Alamosa, is requesting Statements of Qualifications (SOQs) from consultant firms to provide engineering design, surveying, and environmental services for a Federal American Rescue Plan Act of 2021 (ARPA) funded project. The project limits are between 3rd Street and 6th Street on Hunt Avenue in the City of Alamosa. The project scope of work includes the design and construction of new curb and gutter, 10-foot sidewalks, ADA /PROWAG-compliant curb ramps with streetscaping on both sides of the street. Streetscaping will include interpretive signage, benches, movable planters, irrigation, landscaping, and street lighting. Project scope includes the cost of a full-depth construction of the roadway including excavation of substrate and installation of geotextile for stabilization as well as the replacement of the existing sanitary sewer main, installation of new storm drain pipe and laterals, sanitary sewer manholes, and new fire hydrants. The roadway and sidewalk in the 300 block have been recently resurfaced and the full road treatment may be excluded in the scope of work in order to allocate funds to other areas of the project. Proposals received after the deadline will not be considered.Please submit questions in writing by email to Rachel James at rjames@ci.alamosa.co.us. Please ensure the subject line includes "Project Inquiry: Hunt Avenue Cultural Trail." All questions must be asked in writing. Question Deadline: August 16, 2023 Approx. Design & Engineering Start Date: September 30, 2023 Approx. Design & Engineering Completion Date: May 31, 2024 Construction Final Completion Date: August 31, 2026 The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.