Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 2, 2023

October 31, 2023

170 MacGregor Ave

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

170 MacGregor Ave, Estes Park, CO

Subscribe to View Full Documents

Reference Number 0000326377 The Town of Estes Park Water Division is solicitating requests for bids/quotes for a specialized contractor to complete the rehabilitation of our existing Thunder Mountain potable water storage tank. General Requirements - Insurance Required During our most recent (2023) tank inspection, damage was observed in the tank interior as shown in the photos provide in Figure 3 (provided on the next page). The Town contracted with JVA to confirm the condition of the tank and make recommendations regarding repair (Attachment A). The Town is seeking a qualified tank rehabilitation contractor to: 1) seal cracks with a hydrophobic polyurethane crack injection product like SikaFix HH+, 2) sawcut spall at interior surface (near tank bottom) perpendicular to the wall surface on all sides and remove 1" beyond reinforcement bars (approximately 15 sf), 3) install protective coating or cathodic protection on reinforcing bars, 4) repair spalled area, replace concrete, 5) line the entire tank interior (sides, bottom) with NSF approved epoxy coating at 40 mils thickness, 6) coat exterior top of the tank with epoxy (not required to be NSF approved), and 7) assist the Town with placing the tank back into service. The tank must be taken off-line to complete the repairs resulting in the need for the qualified contractor to provide temporary tank storage as required to maintain our water system pressure and meet fire flow Consultant shall provide and furnish at its own cost and expense all materials, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to provide its Services in strict accordance with the conditions and prices stated in the Contract Documents.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.