Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

September 26, 2023

November 24, 2023

Sable Blvd & E 30th Ave

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Sable Blvd & E 30th Ave, Aurora, CO

Subscribe to View Full Documents

Reference Number 0000326361 The 30th & Sable Trail Connection and Intersection Improvements project consists of narrowing 30th Avenue and improving pedestrian facilities leading up to and at the intersection of 30th Avenue and Sable Boulevard to be ADA compliant and include an intersection crossing with Rectangular Rapid Flashing Beacons (RRFBs). Construction consists of the following improvements: 10' wide sidewalk and ADA compliant curb ramps Asphalt pavement reconstruction and mill and overlay Erosion control and earthwork RRFB crossing Improved bus stop landing Landscape restoration, tree trimming and shrub removal Question Deadline 08/07/2023 at 3:00 PM MT Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Kristin Chewiwi, Procurement Supervisor, at kchewiwi@auroragov.org AND Raul Griego, Project Manager, at rgriego@auroragov.org Bid Bond 5 % Performance Bond 100 % Payment Bond 100 % The estimated cost for this this project ranges from $400,000.00 to $500,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contract Documents require that all work be completed within two (2) months, after issuance of notice to proceed. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,000.00 per day. Pre-Bid Conference (Optional) August 2, 2023 @ 10:00 AM OPTIONAL Pre-Bid Conference Attendance is not mandatory, but highly recommended This event will be held online using Microsoft Teams https://teams.microsoft.com/l/meetup-join/19%3ameeting_NWUxY2Y1MzItY2M2Zi00NGFhLWFmY2EtZmFhZjdiMTBiOTll%40thread.v2/0context=%7b%22Tid%22%3a%229cf07bc1-6fa2-4d49-bc93-7acced6cc8d7%22%2c%22Oid%22%3a%229ad8ca8a-2024-4f8b-a322 bb9a961df17d%22%7d

92 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.