Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

January 1, 2024

February 22, 2024

3820 Macedonia Rd

Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

3820 Macedonia Rd, Powder Springs, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000325909 Cobb County PARKS is seeking a qualified contractor to resurface the outdoor pool at Seven Springs Water Park, pursuant to the plans, specifications, and conditions contained herein. Question Acceptance Deadline 08/15/2023 05:00 PM EDT Questions are submitted online No Proposals must be accompanied by bid security in the amount not less than five percent (5%) of the base bid. Performance Bond and Labor and Material Payment Bond, or other security instruments as allowed by law each in the amount equal to 100% of the contract sum will be required of the successful bidder. Bonds must be written by a surety company licensed to do business in the State of Georgia, have a "Bests" rating of "A" or better, appear on the current U.S. Treasury Department list of sureties that are acceptable on bonds for the federal government (Circular 570), and have a recommended bonds limits equal to or in excess of those required for this project; otherwise acceptable to the owner. The construction duration for the work in this contract is one hundred and twenty (120) calendar days from notice to proceed. Failure to substantially complete the work within 120 calendar days plus any approved extensions shall result in liquidated damages in the amount of Two hundred ($200.00) per calendar day. Final completion shall be reached within 30 days of substantial completion. Failure to reach final completion within that time period will result in liquidated damages of One Hundred ($100.00) per calendar day. Refer to the Sample Contract for Construction in the Project Manual for additional information concerning liquidated damages. Notice to Proceed On or about January 1, 2024

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.