Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

March 31, 2024

October 7, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$12,500,000.00

Public - City

img_map_placeholder

Multiple Locations, San Andreas, CA

Subscribe to View Full Documents

San Andreas Reservoir Road Improvements A General Engineering Contracting, Earthwork & Paving, Landscape Contractor, Pipeline Contractor, Reinforcing Steel Contractor, Structural Steel Contractor, Tree Service, Welding Contractor, Trucking and Hauling. This Project is subject to compliance monitoring and enforcement of prevailing wage requirements by the California Department of Industrial Relations (DIR) and the San Francisco Office of Labor Standards Enforcement. The Local Business Enterprise (LBE) subcontracting requirement is 10.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs and SFPUC Micro & Small-LBEs. The LBE subcontracting participation requirement is 10.00% due to a high degree of specialty work involved in this contract including the installation of the cast-in-drilled-hole soldier lagging retaining wall with tiebacks and shotcrete facing. The objective of the project is to protect SFPUC access roads along San Andreas Lake and Reservoir by re-establishing eroded embankments and by constructing retaining walls. Additionally, the debris boom anchors will be replaced. The work is to be performed in County of San Mateo, California. Micro and Small-LBE subcontracting participation breakdown: 4.32% MBE; 1.19% WBE; 4.49% OBE.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.