Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 10, 2023
October 2, 2023
May 3, 2024
To Be Determined
Remodeling, Renovation, Site Work
No Information to Display
No Information to Display
Public - City
To Be Determined, N Wildwood, NJ
The Scope of work for this Contract comprises of a base bid which includes the rehabilitation of the Wildwood Boardwalk from Oak Avenue to Schellenger Avenue (Phase III) and the complete replacement of the Cedar Avenue Connector section of boardwalk running East to West (Phase IV). This contract also includes three alternate bid items which are boardwalk rehabilitation per block heading south starting at Schellenger Avenue and ending at Spicer Avenue (Phase V). The scope for Phase III, Oak Avenue to Schellenger Avenue, includes the careful removal of the existing IPE decking to expose the glulam framing beneath. The glulam stringers and some girders currently have wood rot and need timber repairs. After the repairs and improvements are carried out the existing IPE decking is to be reinstalled. The scope of Phase IV, Cedar Avenue Boardwalk, includes the demolition and complete removal of the existing boardwalk and substructure. This phase also includes the partial removal of the cantilevered concrete slab on the north side of the boardwalk and two existing light poles. Once all demolition is completed the construction on the replacement boardwalk can begin. Replacement will include new timber piles, girders, framing, and decking. Also included in this phase is a new archway sign, railings, perforated metal fencing, bike racks, light poles and other boardwalk amenities. The Scope of the alternate bid items, Phase V, the scope includes the removal and replacement of the existing timber portions of the existing boardwalk; removal and replacement of the existing boardwalk railings; removal and replacement of the existing boardwalk lighting; the removal of the existing concrete trolley slabs; the repair of the existing concrete substructure; reconstruction of existing timber boardwalk outcrops and installation of new timber stairs.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
N Wildwood, NJ
Bid Date: Aug 17 2023
N Wildwood, NJ
Bid Date: Aug 31 2023
N Wildwood, NJ
Bid Date: Oct 22 2024
Randolph, NJ
Bid Date: Jul 18 2023
Englewood, NJ
Bid Date: Aug 08 2023
Hamilton, NJ
Bid Date: Jun 28 2023
Woodstown, NJ
Bid Date: Jul 06 2026
Trenton, NJ
Bid Date: Jun 27 2023
Lakehurst, NJ
Bid Date: Aug 10 2023
Paterson, NJ
Bid Date: Jun 22 2023
Vineland, NJ
Bid Date: Aug 23 2023
Cedar Grove, NJ
Bid Date: Jun 27 2023
Burlington Township, NJ
Bid Date: Aug 08 2023
Salem, NJ
Bid Date: Jul 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
