Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

September 1, 2023

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, West Menlo Park, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest on the SAM.GOV posting Interested Vendors List, or by emailing the Procurement Specialist for this project. Crane and Rigging Services - Davis-Bacon Act (DBA) / Service Contract Act (SCA) The purpose will be to solicit subcontract support crane and rigging services in support of equipment installation and construction projects. Equipment to be offloaded, transported, and placed in its final location for installation includes sensitive scientific equipment, large industrial equipment, building equipment and other equipment. Work locations include sensitive scientific spaces, congested spaces, tunnels, building, roofs, equipment pads, etc. The sample Statement of Work describes the crane and rigging requirements Compliance with all Davis-Bacon OR Service Contract Act requirements for all work performed under this IDIQ contract. Some orders will be issued as Task Order Releases against the master IDlQ subcontract award being solicited. In these cases, SLAC Firm-Fixed-Price Construction Terms and Condition will be incorporated as part of each Task Order. On other orders, where DBA is not applicable, a Service Order will be issued. In such cases, SLAC Firm-Fixed-Price Supplies and/or Services Terms and Conditions will be incorporated. Potential bidders will need to meet all necessary criteria outlined in Section L of the draft RFP. A partial list of the criteria required include the following: o The Offeror's contractor's license has not been revoked within the past five (5) years; o The Offeror's company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts; o Neither the Offeror's firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract; o Offeror must demonstrate the ability to obtain a local presence in the San Francisco Bay Area, if awarded a subcontract; and o The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror's company cannot have any U.S. projects within the past five (5) years that have been terminated for default. Best Regards, Ryan Hodges SLAC Sr. Subcontract Administrator

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects