Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 15, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, El Paso, TX

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Engineer Estimate: $$5,679,654.75 - $$6,468,495.69 Questions Deadline: August 1, 2023 by COB Questions can be sent to: purchasing.info@epwater.org *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: Shall include, but is not limited to approximately 20 lineal feet of 21-inch sanitary sewer pipe; 5,340 lineal feet of 24-inch sanitary sewer pipe; Approximately 1,840 lineal feet of 27-inch sanitary sewer pipe; Approximately 1,540 lineal feet of 30-inch sanitary sewer pipe; Approximately 60 lineal feet of 8- inch sanitary sewer pipe; twelve 72-inch diameter manholes; one 72-inch diameter drop manhole; Approximately 170 lineal feet of extra depth for manholes; Approximately 7,166 cubic yards of excavation (cut to export); Approximately 279 cubic yards of excavation (cut to fill); Approximately 8,740 lineal feet of trench excavation protection; Approximately 6,250 lineal feet of removal and replacement of farm fence; Approximately 8,640 lineal feet of 16-inch water pipe; Approximately 30 lineal feet of 24-inch water pipe; Approximately 20 lineal feet of 8-inch water pipe; Approximately seventeen 16-inch gate valves with manhole and bonnet box, one 8-inch gate valve with bonnet box; three blow-off valves with manhole; three 2-inch combination valves with manholes; Approximately 10,971 cubic yards of excavation (cut to export); Approximately 275 cubic yards of excavation (cut to fill); Approximately 8,670 lineal feet of trench excavation protection; corrosion protection system; videotaping of project site before and after construction; and a traffic control plan. Wages paid on this project shall be not less than the minimum prevailing wage rates listed in the Contract Documents, Section 00840, General Wage Requirements

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.