Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 17, 2023

December 1, 2023

117 N Charter St

Renovation

No Information to Display

$94,750.00

Public - State/Provincial

img_map_placeholder

117 N Charter St, Madison, WI

Subscribe to View Full Documents

In general, the work consists of: the installation of a high pressure steam piping cross tie from the outlet side of a pressure reduction valve/desuperheater to the campus steam distribution header prior to the distribution header exiting the heating plant to the steam tunnel. The work will include the supply and installation of approximately 100 linear feet of 8" steam piping and fittings, two 8" isolation valves (furnished by the Using Agency), small bore 43 drains and traps as required, pipe supports, and thermal insulation.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.