Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2023

September 6, 2023

December 31, 2024

909 E Sprague Ave

Addition, Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

909 E Sprague Ave, Spokane, WA

Subscribe to View Full Documents

the city of spokane facilities department is seeking bids for the wastewater building office expansion project. this project constitutes a public work under state law. clarification deadline : 7/28/2023 3:00 pm submit all questions through the clarification tab. The City of Spokane Wastewater Department, through the Facilities Department, is requesting bids for the construction of approximately 1,100 square feet of new offices space and the replacement of electrical services at the site. This new space will be on the mezzanine level of the main Wastewater Office located at 909 East Sprague Avenue. This work will include minor demolition of various systems and materials to allow for new structure and finish work in the mezzanine area, and the replacement of a significant portion of the electrical service for the building. The new offices will require significant coordination with the department. The upgraded electrical service will include a new electrical main panel, subpanels, and service connections. Please refer to the included construction drawing package and specifications for all related project information, specifications, and details. Alternate #1 - Vinyl Plank Flooring Replacement at Toilet Room Entrances This alternate includes the removal and replacement of the existing flooring system at the entrances to the toilet rooms where new walls are required, as detailed in the contract documents. If the work can be completed without damage to the flooring, the existing will remain in place

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.