Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 4, 2023

September 4, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Eugene, OR

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Project includes provide all labor, equipment, and material necessary to insulate steam and condensate piping as indicated in included scope of work document. The existing pipe insulation is asbestos-containing and will be removed by others prior to the start of insulation work. Close coordination with the abatement contractor will be required in order to schedule activities to follow one another, to limit downtime, to help anticipate any possible delays, and to address any lead time issues as the piping cannot be left uninsulated between scopes Attendance will be documented through a sign-in sheet prepared by the Owner's Representative. Prime bidders who arrive more than 5 minutes after start of time of the meeting (as stated in the Solicitation Document and by the Owner's Representative's watch) or after the discussion portion of the meeting (whichever comes first) shall not be permitted to sign in and will not be permitted to submit a bid on the Project. No offer will be received or considered by Owner unless the offer contains a statement by the bidder as a part of the offer that states: "Contractor agrees to be bound by and will comply with the provisions of ORS 279C.838, 279C.840 or 40 U.S.C. 3141 to 3148." All bidders must be registered with the Construction Contractor's Board at the time of bid submission. No bid will be considered unless fully completed in the manner provided in the "Instructions to Bidders" upon the Bid form provided. UO encourages bids from Minority, Women, and Emerging Small Businesses.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.