Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 1, 2024

May 30, 2025

677 High St

Renovation

No Information to Display

$2,392,000.00

Public - State/Provincial

img_map_placeholder

677 High St, Clinton, MA

Subscribe to View Full Documents

Digester Fixed Cover Replacement Clinton Wastewater Treatment Plant. Contractor Category: Sewage and Water Treatment Plant; General Building Construction. This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement. General Bid Deadline 9/15/23 Time 2:00 P.M. The work involves the demolition of the existing concrete dome cover of the fixed cover digester, erection, installation, and testing of a new stainless steel dome cover on the digester.

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.