Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

November 2, 2023

July 4, 2025

9950 NE 6th Drive

Renovation

No Information to Display

$4,500,000.00

Public - City

img_map_placeholder

9950 NE 6th Drive, Portland, OR

Subscribe to View Full Documents

The Scope of Work will provide Owner with site improvements and replacement of the existing pump station with a new wet well, new electrical and controls building, new generator, and additional new infrastructure including valve vault, pig launcher and vacuum release valve. NE 6th Drive Pump Station Upgrade Project. All public improvement projects with an engineer's estimate of $500,000 or greater requires pre-qualification Bidders shall be prequalified in Class 10 - Sewage Pumping Stations, in the amount of $4,500,000 Refer Questions to: Mahn Saechao Sr. Procurement Specialist Phone: (503) 823-8323 Mahn.Saechao@portlandoregon.gov A Landscape Contractors Board license is required in accordance with ORS 671.530 if the bid specification includes landscape work as defined by ORS 671.510. For information contact: LANDSCAPE CONTRACTORS BOARD 2111 Front St. NE, Suite #2-101 Salem, OR 97301 (503) 378-5909 No bid will be considered unless accompanied by a certified check, cashier's check, or a bid bond for an amount not less than ten percent (10%) of the aggregate amount of the bid. It shall be payable to the City of Portland as a guarantee that the bid shall be irrevocable for a period of sixty (60) calendar days, unless otherwise specified, after the bid opening date and time and as liquidated damages should the Bidder fail or neglect to furnish the required performance bond and insurance and execute a contract within ten (10) calendar days after receiving said contract from the Chief Procurement Officer for execution. The bid security shall be retained for a period-of-time in accordance with City of Portland Code 5.33.410 and 5.34.410. Performance and payment bonds are required for contracts with a value of $150,000 and above. The forms for the Performance Bond and the Payment Bond, to be executed by the successful Bidder for the Work and delivered to the City not later than the date of execution of the Contract, are the standard forms of the City of Portland, Oregon. Such forms, incorporated into these Bid Documents by reference only and not physically contained herein, may be reviewed by prospective Bidders at Procurement Services, City of Portland, 1120 SW 5th Avenue, Room 1040, Portland, Oregon, 97204, phone (503) 823-5047. The Bonds, in an amount equal to one hundred percent (100%) of the Contract Sum, shall be satisfactory to the City and shall be executed by a corporate surety licensed to do business in the State of Oregon. The attorney in fact who executed the Bonds on behalf of the surety shall affix thereto a certified and current copy of his power of attorney and shall indicate the monetary limit of such power. It is the Contractor's responsibility to read and fully understand this section of the bid specifications and to comply with all provisions of the program, regardless of whether they appear on this checklist. Contractors shall include in their bid all costs associated with complying with the Workforce Program. An 18% aspirational goal for minorities, and 9% for females has been set on City-Owned/Sponsored construction projects for apprentices and journey level workers. All Work shall be performed within the following Project Milestones 1. Substantial Completion shall be no later than 550 Calendar Days after the date of Notice to Proceed. 2. Final Completion shall be within 60 Calendar Days of the date of Substantial Completion If the Contractor fails to achieve Substantial Completion within the Contact Time, the Contractor agrees to pay Liquidated Damages in the amount of $2,300 Engineer of Record: Jen Murphy; Parametrix 700 NE Multnomah, Suite 1000 Portland, OR 97232 503-233-2400

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.