Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

April 3, 2024

June 23, 2025

151 Tuskegee Dr

New Construction, Paving, Site Work

No Information to Display

$11,000,000.00

Private

img_map_placeholder

Redacted Address, Oak Ridge, TN

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The project consists of a new 47,584 SF sprinklered, four-story slab on grade, wood framed hotel with fiber cement lap siding, architectural masonry and asphalt shingle roofing. Trades included but not limited to: Cast-In-Place Concrete, Masonry, Rough & Interior Carpentry, Wood Trusses Countertops, Plastic Paneling, Waterproofing, Insulation, Weather Barriers, Asphalt Shingles, TPO Roofing, Firestopping, Joint Sealants, D/F/H, Access Doors & ...

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.