Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 11, 2023

September 6, 2024

118th Ave

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

118th Ave, Edmonton, AB

Subscribe to View Full Documents

The scope consists of the replacement or retrofitting of the existing secondary distribution panels; this includes the transformer and contactor upgrades. Due to the amount of equipment included in the scope of work, the project will be split into two phases. Phase 1 (2023), we will focus on purchasing long lead items. Phase 2 (2024) will be active construction during the summer of 2024 to avoid staff and student programs. The construction scope of work will be as follows but not limited to: Thirty-nine (39) panels of various voltages and sizes (SDP included) Three (3) transformers being replaced and (2) two being removed Eleven (11) contactors Two (2) MDP (Main Distribution Panel) Documents can be obtained from https://nait.bonfirehub.ca/opportunities/69391

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.